Data Barang Masuk
Gunakan halaman ini untuk mengatur data Barang Masuk.
| Tanggal | Kode | Nama | Jumlah | Harga | Total | Merek | Actions |
|---|---|---|---|---|---|---|---|
| 00-03-2026 | T1/2 | TEE 1/2" | 20 | 1,900 | 38,000 | BUAH | |
| 00-03-2026 | CWD | CUTTING WD | 20 | 2,900 | 58,000 | BUAH | |
| 00-03-2026 | KD | KRAN DISPENSER | 12 | 6,000 | 72,000 | BUAH | |
| 00-03-2026 | HA | HAK ANGIN | 12 | 7,000 | 84,000 | PASANG | |
| 00-03-2026 | KB | KRAN BIASA | 12 | 5,000 | 60,000 | BUAH | |
| 00-03-2026 | FGB | FITTING GANTUNG BIASA | 12 | 3,000 | 36,000 | BUAH | |
| 00-03-2026 | KAK | KIPAS ANGIN KARAKTER | 2 | 50,000 | 100,000 | BUAH | |
| 00-03-2026 | GBB | GERGAJI BESI BIASA | 6 | 5,000 | 30,000 | BUAH | |
| 00-08-2026 | LPB | LEM PRALON BIASA | 12 | 6,000 | 72,000 | BUAH | |
| 00-08-2026 | LG23 | LAMPU GREENTERA 23W | 10 | 23,000 | 230,000 | BUAH | |
| 00-08-2026 | SKH | SIKAT KAWAT HALUS | 10 | 8,000 | 80,000 | BUAH | |
| 00-08-2026 | BK | BUNNER KOMPOR | 10 | 7,000 | 70,000 | BUAH | |
| 00-08-2026 | SA | SODA API KECIL | 10 | 4,000 | 40,000 | BUNGKUS | |
| 00-09-2026 | SCWB | STEKER CW BROCO | 14 | 15,000 | 210,000 | BUAH | |
| 00-09-2026 | SBR | STEKER BULAT BROCO | 2 | 15,000 | 30,000 | ||
| 00-09-2026 | SIL | SILTIP KRAN | 40 | 1,500 | 60,000 | BUAH | |
| 00-09-2026 | TD3 | T DUS 3 PUTIH | 10 | 2,000 | 20,000 | BUAH | |
| 00-09-2026 | TD4 | T DUS 4 PUTIH | 10 | 2,000 | 20,000 | BUAH | |
| 00-09-2026 | TD3H | T DUS 3 HITAM | 30 | 2,000 | 60,000 | BUAH | |
| 00-12-2026 | ITG | ISI TABUNG GAS | 10 | 20,000 | 200,000 | BUAH | |
| 00-12-2026 | KTI | KEREKAN TIMBA | 2 | 15,000 | 30,000 | BUAH | |
| 00-13-2026 | LKK | LAKBAN KERTAS KECIL | 12 | 4,000 | 48,000 | BUAH | |
| 00-13-2026 | LKS | LAKBAN KERTAS SEDANG | 12 | 7,000 | 84,000 | BUAH | |
| 00-15-2026 | K1 1/2 | KUAS 1 1/2" | 24 | 1,700 | 40,800 | BUAH | |
| 00-15-2026 | K1 | KUAS 1" | 24 | 1,500 | 36,000 | BUAH | |
| 00-15-2026 | K2 | KUAS 2" | 6 | 3,000 | 18,000 | BUAH | |
| 00-15-2026 | K5 | KUAS 5" | 12 | 6,000 | 72,000 | BUAH | |
| 00-15-2026 | KAIB | KAWAT AYAK IJO BESAR | 10 | 12,000 | 120,000 | METER | |
| 00-15-2026 | KABS | KAWAT AYAK BIASA SEDANG | 10 | 8,000 | 80,000 | METER | |
| 00-02-2026 | LF | LEM KAYU FOX | 10 | 12,000 | 120,000 | BUNGKUS | |
| 00-05-2026 | P004 | PAKU 4 | 5 | 16,000 | 80,000 | KG | |
| 00-05-2026 | P007 | PAKU 7 | 10 | 16,000 | 160,000 | KG | |
| 00-05-2026 | KT | KAWAT TALI | 2 | 18,000 | 36,000 | KG | |
| 00-05-2026 | TB | TALANG BULAT | 6 | 4,000 | 24,000 | BOTOL | |
| 00-26-2026 | S001 | SEMEN 40Kg | 9 | 43,500 | 391,500 | SAK | |
| 00-26-2026 | P005 | PAKU 5 | 5 | 15,500 | 77,500 | KG | |
| 00-26-2026 | P007 | PAKU 7 | 7 | 15,500 | 108,500 | KG | |
| 00-26-2026 | P004 | PAKU 4 | 5 | 15,500 | 77,500 | KG | |
| 00-26-2026 | P002 | PAKU TRIPLEK | 2 | 26,000 | 52,000 | KG | |
| 00-26-2026 | KT | KAWAT TALI | 3 | 15,000 | 45,000 | KG | |
| 00-26-2026 | TK | TINER KRATINGDAENG | 6 | 4,000 | 24,000 | BOTOL | |
| 00-26-2026 | R1/2 | RUCIKA 1/2"AW | 5 | 21,000 | 105,000 | BATANG | |
| 00-26-2026 | KN1/2 | KNIE 1/2 | 20 | 2,000 | 40,000 | BUAH | |
| 00-26-2026 | AM | AMPLAS METERAN | 50 | 3,000 | 150,000 | METER | |
| 00-26-2026 | KNYM | KABEL 2x1,5 BIASA | 30 | 3,000 | 90,000 | METER | |
| 00-26-2026 | KHYO | KABEL 2x0,75 BIASA | 30 | 2,000 | 60,000 | METER | |
| 00-26-2026 | KKS | KABEL KAWAT SATUAN | 30 | 2,000 | 60,000 | METER | |
| 00-26-2026 | AL | AMPLAS LEMBARAN | 50 | 2,000 | 100,000 | LEMBAR | |
| 00-26-2026 | S002 | SEMEN CURAH | 10 | 2,000 | 20,000 | KG | |
| 00-26-2026 | LBDK | LEM BESI DEXTON KECIL | 10 | 8,000 | 80,000 | BUAH | |
| 00-26-2026 | TES | TESPEN | 6 | 5,000 | 30,000 | BUAH | |
| 00-26-2026 | B6201 | BEARING 6201 | 10 | 10,000 | 100,000 | BUAH | |
| 00-26-2026 | EKAB | ENGSEL KANDANG AYAM BAGUS | 12 | 5,000 | 60,000 | PASANG | |
| 00-26-2026 | TM | TEE MULTI | 6 | 6,000 | 36,000 | BUAH | |
| 00-26-2026 | KC1/2 | KRAN CEBOL 1/2 | 6 | 8,750 | 52,500 | BUAH | |
| 00-26-2026 | SF | SERAT FIBER | 50 | 1,500 | 75,000 | LEMBAR | |
| 00-26-2026 | KDDK1/2 | KNIE DRAT DALAM KUNINGAN 1/2 | 2 | 7,000 | 14,000 | BUAH | |
| 00-26-2026 | KLEM1/2B | KLEM 1/2 BESI | 50 | 1,500 | 75,000 | BUAH | |
| 00-28-2026 | SIK | SIKU RAK | 6 | 8,000 | 48,000 | PASANG | |
| 00-28-2026 | BM835 | BAUT MUR M8X35 | 20 | 1,000 | 20,000 | BUAH | |
| 00-28-2026 | PTC | PAKU TRIPLEK CURAH | 10 | 1,500 | 15,000 | BUNGKUS | |
| 00-28-2026 | PB4 | PAKU BETON 4 | 30 | 700 | 21,000 | BUAH | |
| 00-28-2026 | PP | PAKU PINES | 20 | 1,000 | 20,000 | BUNGKUS | |
| 00-28-2026 | S002 | SEMEN CURAH | 40 | 1,500 | 60,000 | KG | |
| 00-28-2026 | KN5/8 | KNIE PRALON LISTRIK | 242 | 500 | 121,000 | BUAH | |
| 00-28-2026 | SP | SPOOL | 6 | 8,000 | 48,000 | PASANG | |
| 00-28-2026 | TL3 | TERMINAL LUBANG 3 | 4 | 12,000 | 48,000 | BUAH | |
| 00-28-2026 | TL2G | TERMINAL LUBANG 2 GEPENG | 3 | 9,000 | 27,000 | BUAH | |
| 00-28-2026 | TL3G | TERMINAL LUBANG 3 GEPENG | 3 | 12,000 | 36,000 | BUAH | |
| 00-30-2026 | CS4 | CAT TEMBOK SUPER 4 | 4 | 63,000 | 252,000 | KALENG | |
| 00-30-2026 | SLGB | SAPU LIDI GAGANG BIASA | 6 | 8,000 | 48,000 | BUAH | |
| 00-30-2026 | TL3 | TERMINAL LUBANG 3 | 1 | 25,000 | 25,000 | BUAH | |
| 00-30-2026 | P5/8 | PIPA LISTRIK 5/8 | 25 | 6,000 | 150,000 | BATANG | |
| 00-30-2026 | OP | OTOMATIS POMPA | 3 | 50,000 | 150,000 | BUAH | |
| 00-30-2026 | BMCB1 | BOX MCB 1 | 3 | 4,000 | 12,000 | BUAH | |
| 00-30-2026 | BMCB2 | BOX MCB 2 | 21 | 6,000 | 126,000 | BUAH | |
| 00-30-2026 | BMCBP6 | BOX MCB PRESTO 6 GROUP | 3 | 20,000 | 60,000 | BUAH | |
| 00-30-2026 | BMCBP8 | BOX MCB PRESTO 8 GROUP | 3 | 25,000 | 75,000 | BUAH | |
| 00-30-2026 | BMCB4 | BOX MCB 4 | 1 | 15,000 | 15,000 | BUAH | |
| 00-30-2026 | CS4WK | CAT TEMBOK SUPER 4 WARNA KHUSUS | 12 | 90,000 | 1,080,000 | KALENG | |
| 00-30-2026 | KSKM | KUNCI SILINDER KAMAR MANDI | 10 | 35,000 | 350,000 | BUAH | |
| 00-01-2026 | SB | SEALANT BOTOL | 4 | 20,000 | 80,000 | BOTOL | |
| 00-01-2026 | TLB | TARIKAN LACI BESAR | 12 | 3,000 | 36,000 | BUAH | |
| 00-01-2026 | T2 | TEE 2" | 5 | 6,000 | 30,000 | BUAH | |
| 00-01-2026 | KS | KABEL STRIKA | 3 | 20,000 | 60,000 | BUAH | |
| 00-01-2026 | PA | PINTU ALUMUNIUM | 2 | 1,750,000 | 3,500,000 | BUAH | |
| 00-01-2026 | T1X3/4 | TEE 1x3/4 | 18 | 7,000 | 126,000 | BUAH | |
| 00-01-2026 | T1x1/2 | TEE 1x1/2 | 12 | 7,000 | 84,000 | BUAH | |
| 00-01-2026 | SDD3/4x1 | SOCK DRAT DALAM 3/4x1 | 55 | 5,000 | 275,000 | BUAH | |
| 00-01-2026 | DDD3/4 | DOP DRAT DALAM 3/4 | 28 | 1,500 | 42,000 | BUAH | |
| 00-01-2026 | D3/4 | DOP 3/4" | 14 | 2,000 | 28,000 | BUAH | |
| 00-01-2026 | DDD1/2 | DOP DRAT DALAM 1/2 | 7 | 1,000 | 7,000 | BUAH | |
| 00-01-2026 | DDL3/4 | DOP DRAT LUAR 3/4 | 6 | 1,500 | 9,000 | BUAH | |
| 00-01-2026 | DDL5/8 | DOP DRAT DALAM 5/8 | 25 | 1,000 | 25,000 | BUAH | |
| 00-01-2026 | DDL1/2 | PLUG/DOP DRAT DALAM 1/2 | 1,000 | 1,000 | 1,000,000 | BUAH | |
| 00-02-2026 | SCO | STEKER COLOK | 45 | 3,000 | 135,000 | BUAH | |
| 00-02-2026 | D1 | DOP 1" | 6 | 2,000 | 12,000 | BUAH | |
| 00-02-2026 | DDL1 | DOP DRAT LUAR 1 | 1 | 2,000 | 2,000 | BUAH | |
| 00-02-2026 | SO5/8 | SOCK 5/8 | 1,000 | 500 | 500,000 | BUAH | |
| 00-02-2026 | SO4 | SOCK4" | 50 | 12,000 | 600,000 | BUAH | |
| 00-02-2026 | S002 | SEMEN CURAH | 40 | 2,000 | 80,000 | KG | |
| 00-02-2026 | LPI | LEM ISARPLAS | 3 | 8,000 | 24,000 | BUAH | |
| 00-02-2026 | KB | KRAN BIASA | 24 | 5,000 | 120,000 | BUAH | |
| 00-03-2026 | B6301 | BEARING 6301 | 10 | 6,500 | 65,000 | BUAH | |
| 00-03-2026 | TMS | TEE MULTI SWIFT | 2 | 18,000 | 36,000 | BUAH | |
| 00-03-2026 | TMK | TEE MULTI KOTAK | 2 | 10,000 | 20,000 | BUAH | |
| 00-03-2026 | TLK23 | TERMINAL 2 LUBANG + KABEL 3M | 1 | 22,000 | 22,000 | BUAH | |
| 00-03-2026 | TLK3 | TERMINAL 3 LUBANG + KABEL 3M | 1 | 25,000 | 25,000 | BUAH | |
| 00-03-2026 | TLK25 | TERMINAL 2 LUBANG + KABEL 5M | 1 | 25,000 | 25,000 | BUAH | |
| 00-03-2026 | TLK35 | TERMINAL 3 LUBANG + KABEL 5M | 1 | 25,000 | 25,000 | BUAH | |
| 00-03-2026 | KT230X30 | KABEL TRANSPARAN 2x30 30 Yard | 1 | 18,000 | 18,000 | ROLL | |
| 00-05-2026 | OP2 | OVERPALE 2" | 24 | 2,100 | 50,400 | BUAH | |
| 00-05-2026 | TLBB | TEMBAKAN LEM BAKAR BESAR | 3 | 25,000 | 75,000 | BUAH | |
| 00-05-2026 | TLBK | TEMBAKAN LEM BAKAR KECIL | 3 | 20,000 | 60,000 | BUAH | |
| 00-06-2026 | SDL1x3/4 | SOCK DRAT LUAR 1x3/4 | 10 | 2,500 | 25,000 | BUAH | |
| 00-06-2026 | SDL1x1/2 | SOCK DRAT LUAR 1x1/2 | 10 | 2,400 | 24,000 | BUAH | |
| 00-06-2026 | P003 | PAKU 3 | 2 | 26,000 | 52,000 | KG | |
| 00-06-2026 | PBP | PAKU BETON PACK (All size) | 6 | 43,000 | 258,000 | PACK | |
| 00-06-2026 | OC | OBAT COR | 1 | 33,000 | 33,000 | KALENG | |
| 00-06-2026 | NDA1 | NO DROP 1kg ABU2 | 2 | 63,000 | 126,000 | KALENG | |
| 00-06-2026 | KN3 | KNIE 3 RUCIKA | 5 | 13,500 | 67,500 | BUAH | |
| 00-06-2026 | LPI | LEM ISARPLAS | 12 | 9,000 | 108,000 | BUAH | |
| 00-06-2026 | TI1 | TINER IMPALA 1 LITER | 2 | 43,500 | 87,000 | KALENG | |
| 00-07-2026 | KN1B | KNIE 1 BIASA | 10 | 2,100 | 21,000 | BUAH | |
| 00-07-2026 | SO1B | SOCK 1" BIASA | 10 | 1,600 | 16,000 | BUAH | |
| 00-07-2026 | T1B | TEE 1" BIASA | 10 | 3,100 | 31,000 | BUAH | |
| 00-07-2026 | T1R | TEE 1" RUCIKA | 7 | 4,000 | 28,000 | BUAH | |
| 00-07-2026 | GTB | GANTUNGAN TALANG BESI | 60 | 3,000 | 180,000 | PASANG | |
| 00-07-2026 | PBC | PAKU BETON CURAH | 15 | 1,500 | 22,500 | BUNGKUS | |
| 00-08-2026 | S002 | SEMEN CURAH | 40 | 2,000 | 80,000 | KG | |
| 00-09-2026 | SLBN | SOLATIP LISTRIK BESAR NITTO | 20 | 8,000 | 160,000 | BUAH | |
| 00-09-2026 | RGD | REGULATOR GAS + PENGAMAN | 1 | 110,000 | 110,000 | BUAH | |
| 00-09-2026 | RL12 | REL LACI 12" | 20 | 16,000 | 320,000 | SET | |
| 00-09-2026 | RL16 | REL LACI 16" | 20 | 18,000 | 360,000 | SET | |
| 00-09-2026 | RL20 | REL LACI 20" | 20 | 20,000 | 400,000 | SET | |
| 00-09-2026 | S001 | SEMEN 40Kg | 10 | 43,500 | 435,000 | SAK | |
| 00-09-2026 | P010 | PAKU 10 | 6 | 14,500 | 87,000 | KG | |
| 00-09-2026 | D3 | DOP 3" | 5 | 7,000 | 35,000 | BUAH | |
| 00-09-2026 | D4 | DOP 4" | 5 | 7,500 | 37,500 | BUAH | |
| 00-09-2026 | GENK | GENTENG KACA | 3 | 22,000 | 66,000 | BUAH | |
| 00-11-2026 | TLK | TARIKAN LACI KAYU | 33 | 2,000 | 66,000 | BUAH | |
| 00-11-2026 | TLP | TARIKAN LACI PLASTIK | 23 | 2,000 | 46,000 | BUAH | |
| 00-12-2026 | KN445 | KNIE 4 45 DERAJAT | 2 | 25,000 | 50,000 | BUAH | |
| 00-12-2026 | KN145 | KNIE 1" 45 DERAJAT | 4 | 6,000 | 24,000 | BUAH | |
| 00-12-2026 | OKD | OTOMATIS KLOSET DUDUK | 1 | 50,000 | 50,000 | BUAH | |
| 00-12-2026 | S002 | SEMEN CURAH | 40 | 1,500 | 60,000 | KG | |
| 00-12-2026 | CS300 | CAT SEMPROT 300CC | 12 | 26,300 | 315,600 | BOTOL | |
| 00-12-2026 | CS150 | CAT SEMPROT 150CC | 12 | 15,400 | 184,800 | BOTOL | |
| 00-12-2026 | T1L | TINER RJ 1 LITER | 12 | 25,300 | 303,600 | KALENG | |
| 00-12-2026 | REM100 | REMOVER RJ 100gr | 6 | 13,700 | 82,200 | KALENG | |
| 00-12-2026 | RS0,8 | ROOF SEALER 0,8 | 3 | 45,500 | 136,500 | KALENG | |
| 00-12-2026 | KGB | KIKIR GERGAJI BAHCO | 6 | 15,000 | 90,000 | BUAH | |
| 00-12-2026 | CGB | CUTTING GURINDA BIASA | 20 | 1,500 | 30,000 | BUAH | |
| 00-12-2026 | E3 | ENGSEL 3 | 24 | 1,500 | 36,000 | PASANG | |
| 00-12-2026 | PBM3 | PAKU BETON MARABU 3" | 3 | 14,000 | 42,000 | PACK | |
| 00-12-2026 | SBCP | SELANG BAK CUCI PIRING | 4 | 13,000 | 52,000 | BUAH | |
| 00-12-2026 | GK18 | GERGAJI KAYU 18" | 2 | 24,000 | 48,000 | BUAH | |
| 00-12-2026 | P8 | PALU 8oz | 1 | 22,000 | 22,000 | BUAH | |
| 00-12-2026 | WP20 | WATER PASS 20 | 2 | 9,000 | 18,000 | BUAH | |
| 00-12-2026 | SK1/2 | STOP KRAN 1/2 | 3 | 4,500 | 13,500 | BUAH | |
| 00-12-2026 | SK1/2x4 | SKRUP KAYU 12x4 | 3 | 4,000 | 12,000 | KOTAK | |
| 00-13-2026 | K3 | KUAS 3" | 12 | 5,000 | 60,000 | BUAH | |
| 00-13-2026 | K2 1/2 | KUAS 2 1/2" | 12 | 4,500 | 54,000 | BUAH | |
| 00-13-2026 | K2 | KUAS 2" | 12 | 3,500 | 42,000 | BUAH | |
| 00-13-2026 | R10x20 | RING 10x20 | 200 | 1,200 | 240,000 | BUAH | |
| 00-14-2026 | TL2 | TERMINAL LUBANG 2 | 2 | 9,000 | 18,000 | BUAH | |
| 00-14-2026 | PLA5 | PLAMIR 5 kg | 3 | 75,000 | 225,000 | KALENG | |
| 00-14-2026 | PLA1 | PLAMIR 1 kg | 3 | 24,000 | 72,000 | KALENG | |
| 00-14-2026 | DEK | DEMPUL KAYU/WOOD PUTTY 200gr | 6 | 18,500 | 111,000 | KALENG | |
| 00-15-2026 | SW | SELANG WATERPAS | 50 | 1,700 | 85,000 | METER | |
| 00-15-2026 | TESK | TESPEN KECIL | 30 | 2,000 | 60,000 | BUAH | |
| 00-15-2026 | SDD1/2K | SOCK DRAT DALAM 1/2 KUNINGAN | 3 | 8,000 | 24,000 | BUAH | |
| 00-15-2026 | KDDL1/2 | KNIE DRAT LUAR KUNINGAN 1/2 | 1 | 10,000 | 10,000 | BUAH | |
| 00-15-2026 | SK1x6 | SKRUP KAYU 1x6 | 5 | 6,000 | 30,000 | DUS | |
| 00-15-2026 | SKH | SIKAT KAWAT HALUS | 12 | 3,350 | 40,200 | BUAH | |
| 00-15-2026 | SKB | SILINDER KUNCI BESAR | 1 | 30,000 | 30,000 | BUAH | |
| 00-15-2026 | SKK | SILINDER KUNCI KECIL | 1 | 25,000 | 25,000 | BUAH | |
| 00-15-2026 | PE | PENGKI | 2 | 8,500 | 17,000 | BUAH | |
| 00-15-2026 | KCST | KRAN CABANG STENLIS | 1 | 27,500 | 27,500 | BUAH | |
| 00-15-2026 | TBR | TUTUP BAUT ROOFING | 1 | 8,000 | 8,000 | PACK | |
| 00-15-2026 | OBSKB | OB STOP KONTAK BIASA | 6 | 8,000 | 48,000 | BUAH | |
| 00-15-2026 | IBEP | IB ENGKEL PHILIPS | 16 | 10,000 | 160,000 | BUAH | |
| 00-15-2026 | MBBS | MATA BOR BESI SET | 2 | 15,000 | 30,000 | SET | |
| 00-15-2026 | FS6B | FISHER S6+BAUT | 1 | 34,000 | 34,000 | SET | |
| 00-15-2026 | FS8B | FISHER S8+BAUT | 1 | 30,000 | 30,000 | SET | |
| 00-15-2026 | FS10B | FISHER S10+BAUT | 1 | 23,000 | 23,000 | SET | |
| 00-16-2026 | TKOM | TUNGKU KOMPOR | 4 | 15,000 | 60,000 | BUAH | |
| 00-16-2026 | KUK | KUAS KAWAT | 30 | 1,000 | 30,000 | BUAH | |
| 00-16-2026 | SENT | SENDOK TAMAN | 2 | 10,000 | 20,000 | BUAH | |
| 00-16-2026 | TLK12 | TARIKAN LACI KOTAK 12 | 6 | 15,000 | 90,000 | BUAH | |
| 00-16-2026 | TLK16 | TARIKAN LACI KOTAK 16 | 9 | 18,000 | 162,000 | BUAH | |
| 00-16-2026 | TLK18 | TARIKAN LACI KOTAK 18 | 10 | 20,000 | 200,000 | BUAH | |
| 00-16-2026 | KAC | KABEL ACCU | 1 | 15,000 | 15,000 | BUAH | |
| 00-16-2026 | PT | PENSIL TUKANG | 4 | 1,000 | 4,000 | BUAH | |
| 00-16-2026 | KBE | KEREKAN BENDERA | 3 | 15,000 | 45,000 | BUAH | |
| 00-16-2026 | LB | LEM BETON / MULTIBOND | 1 | 40,000 | 40,000 | KALENG | |
| 00-16-2026 | PGRCKG | PAKU GRC KILO GRAM | 2 | 25,000 | 50,000 | KG | |
| 00-16-2026 | K3/4K | KRAN 3/4 KUNINGAN | 3 | 40,000 | 120,000 | BUAH | |
| 00-16-2026 | LKB16 | LINGGIS KECIL BESI 16 | 5 | 15,000 | 75,000 | BUAH | |
| 00-16-2026 | PBL | PAHAT BETON LANCIP | 1 | 7,000 | 7,000 | BUAH | |
| 00-16-2026 | PBB | PAHAT BETON BIASA | 1 | 10,000 | 10,000 | BUAH | |
| 00-16-2026 | OBEP | OB ENGKEL PIANO | 2 | 5,000 | 10,000 | BUAH | |
| 00-16-2026 | KDO | KRAN GALON OTOMATIS | 1 | 35,000 | 35,000 | BUAH | |
| 00-16-2026 | KB8G | KUNCI BESI 8 GEPENG | 7 | 15,000 | 105,000 | BUAH | |
| 00-16-2026 | KB10G | KUNCI BESI 10 GEPENG | 8 | 15,000 | 120,000 | BUAH | |
| 00-16-2026 | KBGP | KUNCI BESI GAGANG PIPA/BULAT | 14 | 12,000 | 168,000 | BUAH | |
| 00-17-2026 | LKS | LAKBAN KERTAS SEDANG | 9 | 5,000 | 45,000 | BUAH | |
| 00-17-2026 | KAY | KAWAT AYAM | 10 | 8,000 | 80,000 | METER | |
| 00-17-2026 | PBC | PAKU BETON CURAH | 10 | 1,500 | 15,000 | BUNGKUS | |
| 00-17-2026 | CA40 | CAKAR AYAM 40x40 | 9 | 40,000 | 360,000 | BUAH | |
| 00-17-2026 | KL808 | KUNCI LACI 808 | 2 | 15,000 | 30,000 | BUAH | |
| 00-17-2026 | KLB | KUNCI LACI BIASA | 3 | 7,000 | 21,000 | BUAH | |
| 00-17-2026 | PB7 | PAKU BETON 7 | 50 | 700 | 35,000 | BUAH | |
| 00-17-2026 | PV | POLITUR VERNIS | 4 | 40,000 | 160,000 | KALENG | |
| 00-17-2026 | SFL | SELANG FLEXIBEL | 5 | 25,000 | 125,000 | BUAH | |
| 00-17-2026 | KL | KUAS LUKIS | 50 | 500 | 25,000 | BUAH | |
| 00-17-2026 | SGB | STEKER GEPENG BIASA | 30 | 1,500 | 45,000 | BUAH | |
| 00-17-2026 | SGCW | STEKER GEPENG CEWE | 12 | 1,500 | 18,000 | BUAH | |
| 00-18-2026 | WM11/4 | WATER MUR 1 1/4 | 1 | 15,000 | 15,000 | BUAH | |
| 00-18-2026 | SK1 | STOP KRAN 1 | 2 | 13,000 | 26,000 | BUAH | |
| 00-18-2026 | SAK | SARINGAN KRAN | 3 | 8,000 | 24,000 | BUAH | |
| 00-18-2026 | L | LAKBAN | 17 | 8,000 | 136,000 | BUAH | |
| 00-18-2026 | S001 | SEMEN 40Kg | 10 | 43,500 | 435,000 | SAK | |
| 00-18-2026 | KTG | KAWAT TALI GALVANIS | 2 | 27,000 | 54,000 | KG | |
| 00-18-2026 | KT | KAWAT TALI | 5 | 15,000 | 75,000 | KG | |
| 00-18-2026 | COM | COMPOUND | 1 | 59,000 | 59,000 | SAK | |
| 00-18-2026 | SGD5 | SKRUP GYPSUM DUS 5" | 1 | 42,000 | 42,000 | DUS | |
| 00-18-2026 | KN3 | KNIE 3 RUCIKA | 5 | 13,500 | 67,500 | BUAH | |
| 00-18-2026 | SLB | SAPU LANTAI BIASA | 10 | 9,000 | 90,000 | BUAH | |
| 00-18-2026 | K2x2,5B | KABEL 2x2,5 BIASA | 50 | 5,000 | 250,000 | METER | |
| 00-19-2026 | BR2 | BAUT ROOFING 2 | 100 | 160 | 16,000 | BUAH | |
| 00-19-2026 | BR25 | BAUT ROOFING 2,5 | 100 | 170 | 17,000 | BUAH | |
| 00-19-2026 | BR3 | BAUT ROOFING 3 | 100 | 180 | 18,000 | BUAH | |
| 00-19-2026 | BR4 | BAUT ROOFING 4 | 100 | 230 | 23,000 | BUAH | |
| 00-19-2026 | BR5 | BAUT ROOFING 5 | 100 | 270 | 27,000 | BUAH | |
| 00-19-2026 | BR6 | BAUT ROOFING 6 | 100 | 310 | 31,000 | BUAH | |
| 00-19-2026 | BR7 | BAUT ROOFING 7 | 100 | 420 | 42,000 | BUAH | |
| 00-20-2026 | SBR | STEKER BULAT BROCO | 3 | 12,000 | 36,000 | BUAH | |
| 00-21-2026 | PGRC | PAKU GRC | 10 | 1,500 | 15,000 | BUNGKUS | |
| 00-21-2026 | PTC | PAKU TRIPLEK CURAH | 10 | 1,500 | 15,000 | BUNGKUS | |
| 00-21-2026 | P3C | PAKU 3 CURAH | 10 | 1,500 | 15,000 | BUNGKUS | |
| 00-21-2026 | SPL | SPLIT | 8 | 280,000 | 2,240,000 | KUBIK | |
| 00-21-2026 | R3/4 | RUCIKA 3/4"AW | 1 | 35,000 | 35,000 | BATANG | |
| 00-21-2026 | CWD | CUTTING WD | 20 | 2,900 | 58,000 | BUAH | |
| 00-21-2026 | MG1 | MINYAK GORENG 1 LITER | 12 | 20,500 | 246,000 | BUAH | |
| 00-21-2026 | SKMP | SARINGAN KAMAR MANDI PVC | 18 | 4,000 | 72,000 | BUAH | |
| 00-21-2026 | MUC | SEMEN MU CURAH | 40 | 4,000 | 160,000 | KG | |
| 00-23-2026 | GK | GEMBOK KOPER | 15 | 4,000 | 60,000 | BUAH | |
| 00-23-2026 | LF | LEM KAYU FOX | 6 | 11,000 | 66,000 | BUNGKUS | |
| 00-23-2026 | ET3 | ENGSEL TIPIS 3" | 1 | 6,000 | 6,000 | PASANG | |
| 00-23-2026 | ET4 | ENGSEL TIPIS 4" | 10 | 7,000 | 70,000 | PASANG | |
| 00-23-2026 | B10 | BESI 10 | 3 | 70,000 | 210,000 | BATANG | |
| 00-23-2026 | SK5 | SKRAP 5" | 7 | 2,000 | 14,000 | BUAH | |
| 00-23-2026 | SK7 | SKRAP 7" | 1 | 3,000 | 3,000 | BUAH | |
| 00-23-2026 | SK9 | SKRAP 9" | 6 | 4,000 | 24,000 | BUAH | |
| 00-23-2026 | SS | SKRAP SET | 1 | 15,000 | 15,000 | SET |